52,000 t | ||
Total Lenght | : | 2,682 m |
Main Span | : | 1,550 m |
Tower Height | : | 252 m |
601 m | ||
14,500 t |
Power ship process piping |
Designed in PDMS |
Modelling of 6 generator sets and 2 steam turbines |
21 different systems modelling |
30,000 t |
647,480 m² total closed area |
Sensitive architectural, electrical and mechanical finishing works |
912 MW Coal Fired Power Plant |
Overall Size: L 100m / W 50 m |
More than 1,500 pipes |
More than 360 components |
250 t secondary steel |
West Qurna - 2 Oilfield |
ENKA |
PETKIM |
PETKIM |
270 m |
13,000 t |
310 m |
28,500 t |
4,500 t |
Pipe spool shop, built in Tengiz with covered shop space |
10,000 sqm to serve Crude, Gas and Sulphur plants and 750 t / shift / month capacity |
Fabrication of 33,000 carbon steel and stainless steel pipe spools |
8,000 t | ||
Lenght | : | 2 x 822 m |
Benghazi End Reservoir Penstocks